Error message

  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 692 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 695 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 696 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 697 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 700 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_environment_initialize() (line 702 of /home/xp109001/public_html/includes/bootstrap.inc).
  • Warning: ini_set() has been disabled for security reasons in drupal_settings_initialize() (line 806 of /home/xp109001/public_html/includes/bootstrap.inc).

Watter supply project (Phase I, and Phase II), Maputo – Mozambique

Year:

Work Location: 
by the Umbeluzi River - Maputo - Mozambique
Google maps link
Construction Cost: 
40.000.000,00€
Developed Task: 
Fondations and Structures project
Work Status: 
Construction concluded - in operation
Description: 
In order to improve the water supply to the city of Maputo, it was needed to modernize and enlarge the existing Water Plant by the “Umbeluzi” River. The design of the WTW3 – Umbeluzi included two different stages, designed at once but with the possibility of being constructed in different phases. The main goal of the intervention was to highly increase the capacity of an existent water treatment plant, creating two completely new lines of treatment. That was arranged with the construction of one inlet chamber, five clarifiers, ten filters, two technical buildings and one chlorine mixing tank. The referred tanks are connected by a complex mesh of piping and infrastructures.

Client:

Contractor:

Partners: